AAC production technology process
Raw material dealing:Flyash and sand will be transported into the wet ball mill by the belt conveyor afterwards ,the slurry will be transported into slurry tank by slurry pump .
Batching mixing and pouring:The lime and cement will be transported successively by the screw conveyor into automatic weigher for weighs, and
the slurry will be transported by the slurry pump into automatic weigher for weighs.Afte weighing the powder and slurry will be transported into the mixer for uniformity and pouring into the mould box.
Static hardening, curing and cutting: The slurry which be poured into the mould box will preharden in the curing room which temperature is 40-50 degrees in one or three hours. When the body meets hardness of being cut, it will be transported with the mould box by reversal crane into the cutting cart. Thenit will move with the cutting cart for level and vertical cutting.
Steam curing and finished product packaging: The cut body will be put on marshalling site by the crane.The marshalling body will be transported into the autoclaved kettle by the hauling engine or mobile windlass for 8-10 hours maintenance . Afterwards the finished products will be pulled out from the the autoclaved kettle by the hauling engine, with separating and packing then transported into stock by forklift .
ALC production technology process
1. The preparation and storage of raw material
2. Steel bar & mesh cage preparation & preservative treatment
3. Batching、pouring and framing
4. Curing and pulling
5. Cutting and marshalling
6. Autoclave and finishing
sophy li
0086-0539-3220858
sunite@outlook.com,sunite.sophy@outlook.com
0086-15864891133
yinan county, linyi city, shandong province,china